Belgrade, Serbia
Client: Belgrade Waterfront Ltd., Belgrade, Serbia for Investor Eagle Hills, Abu Dhabi, UAE
Construction period: 02/2016 – 07/2018
Type of service: Main contractor
Belgrade, Serbia
Total area: 24.600 sq.m
Client: Energoprojekt Sunnyville LTD, Belgrade, Serbia
Construction period: 02/2016 – 11/2017
Type of service: Turn-key
Belgrade, Serbia
Total area: 5.300 sq.m
Client: Energoprojekt as developer
Construction period: 01/2013 – 06/2016
Type of service: Turn-key
Belgrade, Serbia
Total area: 33.000 sq.m, capacity 20.000 seats
Client: LIMES, Belgrade, Serbia
Construction period: 1991-2000
Type of service: Turn-key
Shah Alam, Malaysia
Total area: 270.000 sq.m, capacity 80.000 seats
Client: Selangor State Government, Malaysia
Construction period: 1990-1994
Type of service: Construction
Montenegro
Total area: 6.000 sq.m, capacity 3.000 seats
Client: Municipality of Herceg Novi, Sc Igalo
Construction period: 2005-2007
Type of service: Turn-key
Belgrade, Serbia
Total area: 28.800 sq.m
Client: Energoprojekt Park 11 d.o.o. Belgrade, Serbia
Type of service: Turn-key
Belgrade, Serbia
Total area: 50.000 sq.m
Client: GP SEVEN d.o.o., Belgrade, Serbia
Type of service: Turn-key
Belgrade, Serbia
Total area: 32.300 sq.m
Client: EMPIRET d.o.o., Belgrade, Serbia
Type of service: Turn-key
Ukhta, Russian Federation
Total area: 27.000 sq.m
Client: Gazprom Transgaz Ukhta LLC, Ukhta, RF
Construction period: 03/2013 – 12/2017
Type of service: Execution of structural, finishing and MEP works
Astana, Kazakhstan
Total area: 35.120 sq.m
Client: TOO Accent Development Solutions
Construction period: 02/2015 – 06/2016
Type of service: Turn-key
Accra, Ghana
Total area: 21.300 sq.m
Client: Ghana Airport Cargo Centre Ltd, Accra, Ghana
Construction period: 03/2014 – 07/2016
Type of service: Design and construction
Tashkent, Uzbekistan
Total area: 30.000 sq.m
Client: Capital Investment Directorate of Tashkent City Assembly, Uzbekistan
Construction period: 03/2004-01/2005 (8 months)
Type of service: Turn-key
Tashkent, Uzbekistan
Total area: 5.750 sq.m
Client: Presidency of the Republic of Uzbekistan
Construction period: 10/1998-03/1999 (6 months)
Type of service: Construction
Sizran, Russia
Total area: 1.200 sq.m
Client: Presidency of Russian Federation
Construction period: 08/2006-04/2007 (8 months)
Type of service: Turn-key
Aktau, Kazakhstan
Site area: 6.3 Ha
Bussines centre: 49.000 sq.m
External works: 4.8 Ha
Client: TOO OIL Real Estate, Almaty, Kazakhstan
Construction period: 11/2007-11/2009
Type of service: Turn-key
Atyrau, Kazakhstan
Total area: 16.000 sq.m
Client: Agro-Industrial Corporation Ardager, Kazakhstan
Construction period: 06/2004-12/2005 (18 months)
Type of service: Turn-key
Uraljsk, Kazakhstan
Total area: 16.200 sq.m
Client: Agro-Industrial Corporation Ardager, Kazakhstan
Construction period: 2005-2007
Type of service: Turn-key
Belgrade, Serbia
Client: Serbian Railways, Belgrade, Serbia
Construction period: 08/2014 – 01/2016
Type of service: Consortium, Main contractor for civil works
Aktau, Kazakhstan
Total area: 11.600 sq.m
Client: Sofie Medgroup, Aktau, Kazakhstan
Construction period: 2013 -2018
Type of service: Turn-key
Belgrade, Serbia
Total area:
– Platform of 2,500 sq.m at the depth of 40m
– Oblique tunnel with 3 escalators 65m long
– Each entrance hall at 3 levels – total area 4,735 sq.m
– Raking tunnel with three elevators: diameter 7.5 m; length 65m; inclination deg. 30° passenger vestibule at 3 levels – 2.600 sq.m
– 5 tunnel emergency exits; total length 436 m
Client: Belgrade Railway Traffic Co., Serbia
Construction period: 1990 -1995
Type of service: Finishing works and plumbing & drainage services
Location: Belgrade, Serbia
Bor, Serbia
Contractor: SNC Lavalin International Inc. / Energoprojekt Oprema a.d.
Type of service: Reconstruction (construction works)
Bor, Serbia
Contractor: SNC Lavalin International Inc. / Energoprojekt Oprema a.d.
Type of service: Construction
Solyanka, Astrakhan region, RF
Total area: 15.000 sq.m
Client: Schlumberger Logelco Inc.
Construction period: 04/2013-11/2014
Astana, Kazakhstan
Total area: 10.500 sq.m
Client: Astana Property Management LLP, Astana, Kazakhstan
Construction period: 09/2016 – 12/2017
Type of service: General Contractor for Fitout Works
Astana, Kazakhstan
Total area: 1.500 sq.m
Client: Astana Property Management LLP, Astana, Kazakhstan
Construction period: 09/2016 – 06/2017
Type of service: General Contractor for SPA Fitout Works
Cape Cost, Ghana
Total area: 8.000 sq.m
Client: Oguaa Hotels Ltd, Accra, Ghana
Date of Completion: 2016
Type of service: General Contractor